113.83 m²
Living room and mini kitchen at 43.57 m², two bedrooms (13.97 and 14.80 m²), a bathroom, plus a bed area, shower and closet. Drawn at 1:100.
Sound-Swim · Atlantic Forest, two hours from Rio
Seventy acres, four waterfalls, no road, no grid, no drawings. Two years later: a six-building first-stage design set and a working property.
Find land worth buying anywhere on earth, buy it, and turn it into somewhere people can actually live and work.
The search ran for a year and a half across continents. Finding the parcel meant hiring a GIS military analyst to read terrain, water and access from satellite data before anyone walked it — that's how four waterfalls inside one boundary turned up. Acquisition in Brazil meant title research, local counsel and a lot of patience. Then the harder part: standing up a team of engineers, architects, lawyers and researchers, and running the build as General Manager for a former Khosla- and Greylock-backed founder.
First stage · six buildings
Living room and mini kitchen at 43.57 m², two bedrooms (13.97 and 14.80 m²), a bathroom, plus a bed area, shower and closet. Drawn at 1:100.
A renovated wood-burning stove, bread and pizza oven, Korean grill, BBQ, vertical vegetable garden, deck with integrated stones, and a vertical awning with mosquito net.
A 3.00 m² dressing room and a 5.85 m³ steam chamber behind an airtight door: cyclopean stone walls, a natural lightweight stone roof, ceramic tile, airtight window, steam head, drainage outlet and a thermostat with overheat sensor. Drawn at 1:50 — the only building taken to a final DWG.
An 81.75 m² pickleball court with the minimum safety distance held, fixed glazing, a built-in masonry niche, wall-mounted tool storage, drinking water, and climbing plants up a vertical garden.
Open space for drawing, books and work (32.93 m²), a white cyc studio (8.14 m²), a soundproof recording space (4.86 m²) and a WC. The 34.98 m² mezzanine was pushed past the original footprint to open the building to the forest.
A 24.12 m² open living area and a 24.54 m² lounge around a sunken zone. Walls covered in natural moss for thermal comfort, a cyclopean stone pillar carrying the green roof, and a staircase stacked from stone already on site. A green roof over clerestory windows running the full perimeter, plus a skylight, do the lighting and the cross-ventilation.
Extracted from the final DWG
The design set exists to make the land usable without flattening it. Buildings sit where the terrain already offers a platform, the river stays the organising line, and nothing is scaled past what can be built and maintained two hours from the nearest city.
Honest status: a work in progress. Trails still being cut, a kitchen half-done, material stacked by the house. The water and the forest were finished long before we arrived.
General Manager — the person accountable for the thing existing.
Photographed on the days it looks ordinary
The land is live. Go and see it.
Architecture: Arq. Nayane Andrade de Oliveira (CAU A590711), Macaé/RJ · first-stage set, June 2025 · Client: Danilo Jackson Vicioso & Oksana Diu